← Ресурси
i4Q - D6.18 Continuous Integration and Validation
D6.18 is including:
• An analysis of the integration of the different i4Q Solutions that are part of the pipeline of each one of the i4Q Pilots.
• A list of the problems that appeared during the integration and the corrective measures applied
Files
- i4q-deliverable-d618-v10.pdf · pdf, 872 KB